Steps for engineered hardwood floor installation
To install engineered hardwood flooring, first prepare and level the subfloor, and allow the wood to acclimate in the room for 48-72 hours. Install a vapor barrier if necessary, then lay out the planks, starting with a straight first row. Continue installing the planks, staggering the joints for a natural look. Trim planks around obstacles and fit the last row. Add transition strips and baseboards to cover gaps, then let the floor settle for 24-48 hours before walking on it. Always follow the manufacturer’s specific instructions for installation.
FLOORING
12/26/20242 min read


Here are the general steps for installing engineered hardwood flooring:
1. Prepare the Subfloor
Clean the Subfloor: Remove any dust, debris, or old flooring materials.
Check for Levelness: Ensure the subfloor is level. Use a leveling compound if needed to fix any low spots.
Moisture Test: For concrete subfloors, conduct a moisture test to ensure it’s dry enough for hardwood installation.
2. Acclimate the Flooring
Allow the engineered hardwood to acclimate to the room's temperature and humidity for 48-72 hours before installation.
3. Install a Vapor Barrier (if needed)
If you're installing over a concrete subfloor or in a basement, you may need a vapor barrier to prevent moisture from seeping into the wood.
4. Layout the Planks
Determine the Starting Point: Choose the longest, straightest wall as your reference point, ideally starting in the left corner.
Measure and Mark a Straight Line: Snap a chalk line to ensure the first row is straight.
Dry Run the Planks: Lay down a few rows to check for the best fit and pattern before committing to any adhesive or fasteners.
5. Cut and Install the First Row
Cut the First Plank: If necessary, cut the first plank to fit the length of the room.
Install the First Row: Place the planks along the chalk line. Ensure that they click or fit snugly together according to the manufacturer’s instructions. If using glue-down or nail-down methods, follow the appropriate steps for applying adhesive or nails.
6. Continue Installing the Remaining Rows
Stagger the Joints: Stagger the joints in each row to create a more natural look and prevent a linear seam.
Click the Planks Together: For floating floors, simply click the planks together. For glue-down or nail-down methods, use the appropriate techniques.
7. Trim Around Obstacles
Use a saw to trim planks around obstacles such as door frames, vents, or cabinets, ensuring a snug fit.
8. Install the Last Row
The last row may require trimming along its length to fit snugly against the wall.
9. Add the Transition Strips
Install transition strips between the hardwood floor and other flooring surfaces (such as tile or carpet) for a neat and secure finish.
10. Finishing Touches
Install baseboards or quarter-round molding along the edges of the floor to cover the expansion gap.
Clean the floor to remove any dust or debris left from the installation process.
11. Let the Floor Settle
Allow the floor to settle for 24-48 hours before walking on it or placing heavy furniture.
These steps can vary slightly depending on the type of engineered wood flooring you have (click-lock, glue-down, or nail-down), so always follow the manufacturer’s specific installation instructions.